University of Warwick
Student Residential Blocks
Drakeset ltd were employed as Principle contractor to oversee and engage the services of various Specialist contractors for the refurbishment of student accommodation blocks including:-
- The Installation and termination of new LV Sub-Main cabling from site Substation to each accommodation block
- The Installation of new LV Distribution panels and Distribution Boards
- The Installation of New Lighting. Emergency lighting and small power
- The Installation of New Fire Alarm System for each student accommodation block
Drakeset have also been responsible for the complete electrical refurbishment of a number of Science Blocks and upgrades in University Buildings across the campus.
Main Boiler House refurbishment
The project comprised of the rewire and refurbishment of the Boiler House ancillary areas, to include together with the electrical engineering services installation associated with the replacement/upgrading of the existing LV cubicle switch panel and installation of new sub main cabling along with final sub circuit cabling.
Scarman House Substation No-17
The Complete electrical engineering services installation associated with replacement/upgrading of the existing HV equipment and cabling together with replacement of LV Cubicle switch Panel and installation of New Sub main cabling.
Multi story Carpark Lighting upgrade.
The complete electrical engineering services installation associated with the replacement/upgrading of the existing lighting installation of central campus Carpark No-7
King Edwards Wharf
Residential Energy efficiency Lighting upgrade.
The project comprised of the installation of High efficiency lighting and lighting controls for Landing and stairwell areas, Occupancy sensors were installed to manage the building lighting so that it is only in use when it is required and ensure the correct level of light is used for the environment
Health and Education
Drakeset ltd are employed to cover a wide range of services for local Health and Education Authority establishments including:-
- The Installation and termination of new LV Sub-Main cabling for critical plant and equipment e.g. Mobile MRI Scanner units, Generators
- The Installation of new LV Distribution panels and Distribution Boards
- The Installation of new containment systems – Ladder rack, Cable tray, Cable Basket, conduit and Trunking systems
- The Installation of New Lighting, External Lighting and Emergency Lighting
- The Installation of New Air conditioning Unit supplies
- The Installation of small power within Hospitals, Colleges and Schools for client requirements
- The Installation of Data Networking cabling for WI-FI system
- The Installation of Door Access cable Networking
- The Installation of New Fire Alarm System cabling
- Provide a call out service to attend daily emergency maintenance breakdowns
Russell’s Hall Hospital
X-ray Room refurbishment
The project comprised of the complete electrical engineering services installation associated with the refurbishment of fully operational X-ray Rooms and installation of New Meigan Earthing system
IBM Warwick (UK) Ltd
Drakeset Ltd are employed on site to cover a wide range of services;
- The Installation and termination of new LV Sub-Main cabling
- The Installation of new LV Distribution panels and Distribution Boards
- The Installation of New Lighting and Emergency lighting for office modifications
- The Installation of small power within the Data centre for critical Main frame equipment
- The Installation of data networking cabling and equipment for critical Main frame equipment
- The Installation of Multicore Fibre networking cabling and equipment for critical Main frame equipment
- The Installation of Bio-metric Door Access cable Networking
Installation of New Power Distribution Units
The project comprised of the installation of 4No- ABB Ltd Satellite PDU LV cubicle switch panels and installation of New sub main cabling from existing PDU’s within a Data centre complete with Load bank testing and commissioning